BIM Project Manager â Data Center
Richmond / Chesterfield, VA (75% On-Site)
Company Vehicle Provided
$140Kâ$150K Base
Broadstaff is recruiting for a leading low-voltage integrator expanding its data center construction division. We are seeking a high-level
BIM Project Manager to lead Division 27 (Communications) and Division 28 (Electronic Safety & Security) scope on a multi-building data center campus in the Richmond, VA area.
This is a critical, direct-hire role supporting a 3-year phased data center program.
Responsibilities
-
Lead BIM/VDC execution for Div 27 & 28 systems
-
Manage coordination with GC and MEP trades
-
Oversee clash detection, RFIs, and issue resolution
-
Produce installation-ready shop drawings
-
Support field teams and scheduling
-
Maintain as-built model accuracy through project turnover
Scope Includes
Division 27
-
Structured cabling (fiber & copper)
-
Cable tray & pathway systems
-
IDF/MDF layouts & rack elevations
Division 28
-
Access control
-
CCTV systems
-
Fire alarm coordination (as required)
Requirements
-
5+ years BIM/VDC experience in construction
-
Strong experience with low-voltage systems (Div 27/28)
-
Data center experience preferred
-
Proficiency in Revit, Navisworks, BIM 360 / ACC
-
Ability to be on-site 75% of the time
-
Client-facing and coordination leadership experience
What Makes This Role Unique
-
Foundational hire in a growing data center division
-
Clear path toward Director-level growth
-
Company vehicle included
-
Long-term, direct hire opportunity
About Broadstaff
Broadstaff is a national staffing firm specialized in providing workforce solutions for telecommunications and information technology. Broadstaff provides flexible staffing support for all areas of network deployments including planning, analysis, design, implementation, construction, operations and maintenance. Our suite of flexible staffing solutions include contract, contract-to-hire, direct-hire, recruitment-process-outsourcing (RPO), and payrolling services. Founded by Carrie Charles in 2015, Broadstaff, LLC is proud to be a diverse supplier and holds active certifications as a Women Business Enterprise (WBE), Women-Owned Small Business (WOSB), and Veteran Business Enterprise (VBE).